About the Project


Locker were contacted in 2016 by Interconnector to provide a safe escape route from the adjacent building to a safe muster point in the event of major event at their Bacton Gas Terminal.

Click to download PDF Project Sheet: Bacton Gas Terminal.

Deliverables
Locker provided a total of 66 Double Skin Ladder (side) and Single Skin Mini ES shields (roof) to protect an escape route with a total length of 75m.

The Heatshields were designed and manufactured to stringent controls and a tight deadline to facilitate the customer’s planned plant maintenance schedule, and the project marked another successful key onshore project for Locker Heatshielding.